양산 일신산부인과

포트폴리오
양산 일신산부인과
인테리스 0 2269 0 0
비회원 기업정보
분류
건축주
위치
디자이너
면적
설계기간
시공기간
준공년도
사진작가
공사비용
의료시설 - 산부인과
병원
부산
대미안
200 ㎡
2 개월
2 개월
2020
최준영
8,000 만원

Text description provided by the architects. The client followed an inherited custodial intention to construct a new building with a strong presence in the centre of the rural town of Schwaikheim, close to Stuttgart. The materiality of wood was an obvious starting point, not only in terms of sustainability and natural resources, but also as a reference to the original training of the client as a carpenter. Out of this came a brief for 6 contemporary apartments and a workshop for the continuing practice as a craftsman.


Save this picture!© Zooey Braun© Zooey Braun

The three-storey timber apartment building and the workshop stand on a connecting massive base, which mediates the height difference and slope of the existing ground plane towards the garden.


Save this picture!SectionSection

Save this picture!First floor planFirst floor plan

Two identical gable profiles, but with different heights and lengths are placed in relation to each other so that a workshop yard is created to act as both collective foreground and an extension of the streetscape. The treatment of the facade with dark painted timber and rough textured concrete is reminiscent of the surrounding context and the original building on the site.


Save this picture!© Zooey Braun© Zooey Braun

All apartments open generously towards the south, which together with the highly insulated building skin and efficient heat pump ensures the heat energy requirements comply with the minimum usage according to the KfW energy efficiency standards. The addition of south orientated photovoltaic panels on the roof results in the annual energy balance of a zero-energy house.

 

관련 프로젝트

전체보기
0 응원하기